Mainsboost Charger MBC 100SV 설치, 운영 및 유지보수 지침 매뉴얼 - 페이지 8

{카테고리_이름} Mainsboost Charger MBC 100SV에 대한 설치, 운영 및 유지보수 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Mainsboost Charger MBC 100SV 20 페이지. Multi water performance system

4 TERMINOLOGY

4.11 System Designation:
It is important to understand what upstream and downstream refers to before
starting the installation.
4.12 Upstream
The term 'Upstream' refers to the system configuration from the consumer's
stopcock to the point where the supply reaches the inlet port of the Mainsboost
Charger Pump.
4.13 Downstream
The term 'Downstream' refers to the system configuration from the outlet tapping
on the Mainsboost Charger Pump, along the distribution header (if configured in
this way) and into the distribution pipework and outlets. This includes hot and
cold services where both are present (see Fig. 3).
Fig. 3
System designation
- 8 -