2 IMPORTANT FACTS
A. Commissioning
2.11 Ensure the pump is primed as described in the priming section before starting,
damage to the shaft seal will result otherwise. See Section 8.16 -
Commissioning.
B. Water temperature
This unit is designed for cold water applications only which should not exceed the
following values:
2.12 The maximum allowable water temperature is 35
2.13 The minimum allowable water temperature is 4
C. Pipework - General
2.14 Secure pipework: Ensure pipework to and from the Mainsboost Charger is
independently supported & clipped to prevent forces being transferred to inlet
and outlet branches of pump. Flexible hoses supplied must be used.
2.15 Flux: Solder joints must be completed and flux residues removed prior to pump
installation (flux damage will void any warranty).
2.16 Pipework design: Care should be taken in the design of pipework runs to
minimize the risk of air locks e.g. use drawn bends rather than 90
D. Plumbing Installation Regulations
2.17 The plumbing installation must comply with the current water and building
regulations.
2.18 The plumbing installation must be installed by a qualified person.
2.19 The electrical installation must be carried out in accordance with the current
national electrical regulations.
2.20 The electrical installation must be installed by a qualified person.