AFRISO PrimoBox ACB 910 작동 및 설치 매뉴얼 - 페이지 17
{카테고리_이름} AFRISO PrimoBox ACB 910에 대한 작동 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AFRISO PrimoBox ACB 910 20 페이지. Mixing unit for condensing boilers
Instruction manual
Fig. 10: Electrical diagram of the mixing set for condensing boiler
ARM ProClick actuators must be electrically connected to a suitable
3-point controller with a 230 V AC control signal.
The actuator power cord is detachable, which makes assembly easier.
To remove the plug from the actuator, lift the lid latch lever (Fig. 11)
and slide the cover off the actuator housing,
then unplug the plug. The plug only fits into
the socket in one position.
Fig. 11: Removing the lid
6.6 Filling and venting
After installation, fill the installation with heating medium. Ensure
adequate venting during filling. Also remember to fill the installation
slowly - this way you will reduce the amount of air remaining
in the installation after it has been filled. If the gas boiler does not have
sufficient pressure, the system must be vented again.
PrimoBox ACB 910 mixing unit for condensing boilers
17