Kohler K-10611T 설치 지침 - 페이지 23

{카테고리_이름} Kohler K-10611T에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-10611T 27 페이지. Floor standing toilet

2. Loosen the long screws as shown.
2.
3. Tighten the locknut to the marked position of OPEN to
take out the supporting board.
3.
4. Take out the supporting board as shown.
4.
5. Take out the break water board.
5.
6. Take out the pole lock and the reversed lock as shown.
6.
1263048-T01-D
"
"
OPEN
Supporting Board
-15-
Detent
Reversed Lock
Pole Lock
Supporting Board
Locknut
Supporting Board
Mask
Slot B
B
Break Water Board
Slot A
A