Dell EMC N2200-ON Series 설치 매뉴얼 - 페이지 6
{카테고리_이름} Dell EMC N2200-ON Series에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell EMC N2200-ON Series 10 페이지. Powerswitch; external power supply installation
Dell EMC N2200-ON Series에 대해서도 마찬가지입니다: 설치 매뉴얼 (10 페이지)
5-inch offset mount
Rear mount
4. Screw the single-switch L-bracket to the two-post rack using two M4 screws (length 6.8 mm) for each bracket.
Torque the screws to 10 inch-lbs.
To remove the switch from the two-post rack, remove the four screws from the two-post rack and slide the switch from the
rack.
MPS-3S two-post installation
This installation procedure is for the three-slot EPS shelf. Use mounting brackets for front, 5-inch offset, or rear-mount
two-post installation.
These mounting supplies ship with the MPS-3S.
1. Locate the mounting brackets and screws that ship with the EPS.
2. Insert the mounting brackets onto the mushroom head on each side of the EPS and slide the mounting bracket back to lock
it into place.
● For front-mount: The mounting bracket and bracket ears face the front of the EPS.
● For five-inch-offset mount: The mounting bracket is at the front of the EPS with the bracket ears facing the back of the
EPS.
● For rear-mount: The mounting bracket and bracket ears face the back of the EPS.
3. Attach the mounting brackets to the switch using four screws for each bracket.
Torque the screws to 10 inch-lbs.
Front-mount
6
N-Series EPS installation