Dell Z9100-ON 설치 매뉴얼 - 페이지 23
{카테고리_이름} Dell Z9100-ON에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Z9100-ON 45 페이지. Open networking
Dell Z9100-ON에 대해서도 마찬가지입니다: 설치 매뉴얼 (45 페이지), 설치 매뉴얼 (43 페이지)
Figure 12. Four-post threaded configuration
2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end, item 2.
Z9100-ON switch installation
You can mount the switch in the 1U front-rack or 1U two-post flush and center configurations. The following is an example of a
front-rack configuration.
For the 1U two-post flush and center configurations, slide the switch into the rails in the same manner as the four-post
configurations.
1U front-rack installation
Configure the rails that are attached to the switch.
1. Attach the inner switch rails to the Z9100-ON switch.
Item 3 shows the detail for the front standoff with the locking tab.
Z9100–ON installation
23