Miele DDG 102 설치 지침 매뉴얼 - 페이지 18
{카테고리_이름} Miele DDG 102에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele DDG 102 28 페이지. External motor roof installation
Miele DDG 102에 대해서도 마찬가지입니다: 운영 및 설치 매뉴얼 (24 페이지), 작동 및 설치 지침 (28 페이지), 설치 지침 매뉴얼 (28 페이지)
Installation
The ducting collar on the motor unit has
a diameter of 150 mm as standard.
If a diameter of 125 mm is required a
reducing collar must be used.
A reducing collar is available to order
from Miele or from your Miele supplier.
Push the flexible ducting onto the
connection on the motor unit and
secure it with a hose clip.
Ducting with a diameter of 150 mm is
then connected to the exhaust side.
If the exhaust air is to be ducted into
the open air, a telescopic wall vent kit
can be used. A telescopic wall vent kit
is available to order from Miele or from
your Miele supplier.
If the motor is installed vertically with
the exhaust ducting venting over a
roof, a roof vent kit DDF 125/150 or
similar measures must be used to
prevent the elements such as
rainwater or snow penetrating the
exhaust opening.
18
Connect the control cable plug
connectors.
Use the extension cable supplied to
lengthen the connection cable if
necessary.
If equipotential bonding is required,
connect the earth cable to the
connection point provided on the
casing.
Equipotential bonding is required if
the control cable is to be extended
by more than the length of the
extension cable supplied (see
"Electrical connection").