ABB ACH580-01 Series 빠른 설치 및 시작 매뉴얼

{카테고리_이름} ABB ACH580-01 Series에 대한 빠른 설치 및 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB ACH580-01 Series 17 페이지. Base drive replacement
ABB ACH580-01 Series에 대해서도 마찬가지입니다: 매뉴얼 (16 페이지), 사용 설명서 (8 페이지), 사용 설명서 (7 페이지), 빠른 설치 및 시작 매뉴얼 (17 페이지), 빠른 설치 및 시작 매뉴얼 (17 페이지)

ABB ACH580-01 Series 빠른 설치 및 시작 매뉴얼
DRIVES FOR HVAC
ACH580-01 drives, NEC types
Quick installation and start-up guide
This guide is applicable to the North American product types. There is a separate guide for the global (IEC) product types.
Documentation in other languages
Safety instructions
WARNING! Obey these instructions. If you ignore them, injury or death, or damage to the equipment can occur. If
you are not a qualified electrical professional, do not do electrical installation or maintenance work.
WARNING! If you enable the automatic fault reset or automatic restart functions of the drive control program,
make sure that no dangerous situations can occur. These functions reset the drive automatically and continue
operation after a fault or supply break. If these functions are activated, the installation must be clearly marked as
defined in IEC/EN/ 61800-5-1, subclause 6.5.3, for example, "THIS MACHINE STARTS AUTOMATICALLY".
Do not do work on the drive, motor cable, motor, or control cables when the drive is connected to the input power.
Before you start the work, isolate the drive from all dangerous voltage sources and make sure that it is safe to start the
work. Always wait for 5 minutes after disconnecting the input power to let the intermediate circuit capacitors
discharge.
Do not do work on the drive when a rotating permanent magnet motor is connected to it. A rotating permanent
magnet motor energizes the drive, including its input and output terminals.
Frames R1...R2, IP21
(UL Type 1): Do not lift the
drive by holding it from the
cover. The cover can come
loose and cause the drive to
fall.
Frames R5...R9: Do not tilt the
drive. The drive is heavy and
has a high center of gravity. It
can topple accidentally.
Frames R5...R9: Lift the drive
with a lifting device. Use the
lifting eyes of the drive.
1. Unpack the drive
Keep the drive in its package until you are ready to install it. After unpacking, protect the drive from dust, debris and
moisture. Make sure that these items are included:
cable/conduit box (frames R1...R2 and R5...R9, IP21 [UL Type 1])
drive
mounting template
control panel (factory-installed on the cover in some drive types)
quick installation and start-up guide
multilingual residual voltage warning stickers
hardware and firmware manuals, if ordered
options in separate packages, if ordered.
Make sure that there are no signs of damage to the items.
2. Reform the capacitors
If the drive has not been powered up for a year or more, you must reform the DC link capacitors. See
contact ABB technical support.
Ecodesign information (EU 2019/1781)
R1...R2
R5...R9
About this document
3AXD50000788286 Rev A EN
2021-07-01
© 2021 ABB. All rights reserved.
Original instructions.
R5...R9
Related documents
1
or