ABB CPS6000 빠른 시작 매뉴얼 - 페이지 2

{카테고리_이름} ABB CPS6000에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB CPS6000 6 페이지.
ABB CPS6000에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (8 페이지)

ABB CPS6000 빠른 시작 매뉴얼
QUICK START GUIDE
Step 2 - Connect AC Inputs
Step 3 - Connect Chassis and DC Reference (CO) Grounds
Connections are on the rear.
Lug Landing: #10 on 5/8-inch center (lugs not provided)
10 AWG recommended
1.
Connect Chassis Ground - Torque to 30 in-lb (4 Nm)
2.
Connect DC Reference Ground - Torque to 30 in-lb (4 Nm)
- Bulk load output
(unprotected)
Chassis Ground.
Step 4 - Connect DC Output
Connections are on the rear. The shelf provides unprotected bulk output to an external distribution panel.
1.
Lug Landing: #10 on 5/8-inch center (lugs not provided)
2.
Connect +Bulk and -Bulk cables - Torque to 30 in-lb (4 Nm)
Step 5 - Set Jumpers - LAN Port and Relay per Galaxy Pulsar Edge Controller Quick
Start Guide
1.
Set Jumpers - LAN Port and Relay
Step 6 - Install Controller per Galaxy Pulsar Edge Controller Quick Start Guide
Step 7 - Install Signal and Communications Cables
Connectors are on front
See Information: Alarm Connections ... for Details
1.
J1 Alarms and Inputs - Connect to office alarms and signals.
2.
J5 LAN - Connect to Ethernet network.
Step 8 - Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar Edge
Controller Quick Start Guide -
1.
Connect 1– Wire Battery Temp and Voltage Monitor to J2
Page 2
© 2021 ABB. All rights reserved.
(Continued)
Note: Some applications may rely on frame
mounting screws for chassis ground omitting the
shelf ground cable
Relay Jumpers
Optional
+ Bulk load output
(unprotected)
DC Reference
ground. If required.