Miller cineline 70 운영자 매뉴얼 - 페이지 7

{카테고리_이름} Miller cineline 70에 대한 운영자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller cineline 70 17 페이지. Fluid head

Miller cineline 70 운영자 매뉴얼
Operating Instructions
2 Fluid Head Set-up (Tripod Bowl)
2.1 Ensure that the TRIPOD BOWL is approximately
horizontal. Place the Fluid Head into the TRIPOD BOWL,
adjust the BUBBLE LEVEL such that the bubble is inside
the black circle and tighten the CLAMP NUT.
Location Boss
7
4mm Hex Key
Threaded Stud
Mitchell Flat Base Adaptor
Location Slots
Tripod Bubble Level
Fig. 5