Siemens TOP WD 1200 작동 및 설치 지침 - 페이지 23

{카테고리_이름} Siemens TOP WD 1200에 대한 작동 및 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Siemens TOP WD 1200 28 페이지.

Siemens TOP WD 1200 작동 및 설치 지침
Align the machine
Fig. 8
! The machine must be perfectly level with all
four feet standing on the floor. It must not
rock from side to side.
Use a spirit level to align the machine on all
sides.
If necessary, correct the height of the machine s
feet.
1. Undo the lock nuts.
2. Adjust the height of the feet.
3. Tighten the lock nuts again firmly to ensure
that the feet remain at the same height.
Water supply - cold only
Fig. 19 , 21 , 22
For the water connection a standard cold-
water line with a minimum water pressure
of 0.1 MPa is required (with tap full ON, at
least 8 liters of water must flow out in one
minute). If the water pressure exceeds 1 MPa,
,
a pressure reducing valve must be added.
! Never connect the machine to the mixer tap
of a pressureless hot-water heater.
! Caution! Connections are under full water
pressure; check for leaks with tap turned
fully ON.
! The filters at the free end of the inlet hose
and at the back of the machine should only
be removed for cleaning purposes.
! To avoid water damage, the tap must be
turned OFF after using the machine.
! The plastic nuts on the hose connections
must only be tightened by hand.
The face of the water tap must be free
of burrs and sharp edges.
en
21