Cisco 2654T6 재포장 매뉴얼 - 페이지 19

{카테고리_이름} Cisco 2654T6에 대한 재포장 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 2654T6 26 페이지. Cisco systems router owner's manual

Appendix A
Repackaging the Router

Reinstalling Components in the Router

Reinstalling the Cards in the Upper and Lower Card Cages
Caution
Reinstalling the Cards in the Switch Fabric Card Cage
Replacing the Blower Modules
Reinstalling the Power Modules
OL-17440-01
If you elected to remove components from the chassis before removing it from the
rack, you must now reinstall all the components in the chassis.
Reinstall all of the cards from the upper and lower card cages in their original
slots.
Reinstall all of the cards in the upper card cage as instructed in the
"Reinstalling the Cards in the Upper Card Cage" section on page
Reinstall all of the cards in the lower card cage as instructed in the
"Reinstalling the Cards in the Lower Card Cage" section on page
Any unoccupied card slot in the upper or lower card cages must have a blank filler
panel installed for electromagnetic compatibility (EMC) and to ensure proper air
flow through the chassis. When the faceplate of a line card does not completely
fill the card slot opening, a narrow card filler panel must be installed for
electromagnetic compatibility (EMC) and to ensure proper air flow through the
chassis.
Reinstall all of the cards from the switch fabric card cage in their original slots as
instructed in the
"Reinstalling the Cards in the Switch Fabric Card Cage" section

on page

3-50.
Replace the blower modules as instructed in the
Modules" section on page
If you removed AC-input power supplies from the chassis, reinstall each power
supply as instructed in the
page
3-75.
Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide
3-47.
"Installing AC-Input Power Supplies" section on
Repackaging the Routers
3-52.
3-53.
"Reinstalling the Blower
A-19