ActronAir CL01-2W 설치 지침 매뉴얼 - 페이지 4

{카테고리_이름} ActronAir CL01-2W에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ActronAir CL01-2W 8 페이지. Control interface

Installation Guide
3. Mount back cover to the wall
• Mount the back cover to the wall with screws via screw
holes. If required, the use of a plasterboard mounting
bracket is recommended to mount the back cover to the
wall.
• Ensure that the Control Interface back cover is aligned and
leveled on the wall before tightening the screws.
BACK COVER
PLASTERBOARD
MOUNTING BRACKET
SCREW HOLES
5. Attach PCB casing to the back cover
• Attach the PCB casing by aligning with the back cover
mounted on the wall.
• Ensure the PCB casing makes a 'click' sound after
mounting.
BACK COVER
NOTE
Front cover can be removed even after installation. Press at
the bottom of the control interface and pull the front cover.
4
4. Connect wiring at the back of Control Interface
• Ensure that all wiring is tightly connected. All wiring must
be in accordance with the provided wiring diagram.
6. Attach the front cover, as shown in the diagram below
IMPORTANT
Ensure protective film is removed from inside of the front
cover before attaching.
• After attaching the front cover, check that the Control
Interface is aligned and leveled on the wall.
PCB CASING
Installation Guide - CL01-2 Control Interface Insert
Document: 9590-3026 Ver. 2 220907
CL01-2 Control Interface
POWER
485 A
485 B
GND
DO NOT CONNECT TRACE WIRE
TO CONTROL INTERFACE.
CUT WIRE, AS SHORT AS POSSIBLE,
IN ORDER TO PREVENT SHORTING.
BACK COVER
AS MOUNTED
ON THE WALL
TWISTED PAIR - 1
TWISTED PAIR - 2
FRONT COVER