Lenovo SE350 매뉴얼

{카테고리_이름} Lenovo SE350에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Lenovo SE350 12 페이지. Toolless friction rail v2
Lenovo SE350에 대해서도 마찬가지입니다: 구성 및 설치 매뉴얼 (24 페이지), 빠른 시작 (2 페이지), 매뉴얼 (8 페이지)

Lenovo SE350 매뉴얼
ThinkSystem Friction 2-Post Screw-in Rail Kit
Read guidelines first
Review the documentation that comes with the rack for safety and cabling information. Before you install the
server in a rack, read the following guidelines:
• Some illustrations might differ from your server. All types of server are removed and installed in a similar
manner.
• See the Maintenance Manual for the maximum room air temperature.
• Do not block any air vents, usually 15 cm (6 inches) of air space provides proper airflow.
• Plan the device installation starting from the bottom of the rack.
• Install the heaviest device in the bottom of the rack.
• Do not extend more than one device out of the rack at the same time.
• Do not place any objects on the top of the rack-mounted devices.
• Connect all power cords to properly wired and grounded electrical outlets.
• Do not overload the power outlet when installing multiple devices in the rack.
• The maximum width of the mounting flange is 225.6 mm (8.9 inches).
Safety notice
CAUTION:
Make sure the rails support your server model and use
safe practices when lifting
1 1