Dreamline UNIDOOR Installation Instruction - Page 2

Browse online or download pdf Installation Instruction for Enclosure Dreamline UNIDOOR. Dreamline UNIDOOR 13 pages. Shower door

Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed
parts are included in the package, by marking all the components on the "Detailed Diagram of
Shower Enclosure Components". Examine boxes and packages for shipping damage. If the unit
has been damaged, has a finishing defect, or has missing parts, please contact our customer support
department within 3 business days of the delivery date. Please note that DreamLine
replace any damaged products or missing parts free of charge after 3 business days or if the
product has been installed. Feel free to contact DreamLine
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine is
not responsible for code compliance standards for your project.
3. If this unit is going to be installed in a new construction, please, install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local
code) plumber for all plumbing installation
4. Please insure that prior to the installation the tub is leveled and solid and will be able to support the
total weight of the unit. Also make sure the walls are at right angles. While some adjustment in
leveling of the door is possible, irregular tub level or improper angle of side walls will result in
serious problems for your installation. Please, note that some adjustments and drilling might be
necessary during the installation process.
5. Please, NOTE! The doors that are under 30" do not have out-of-plumb adjustment. Make
sure your walls are at right angles
6. a) If the width of your door is less than 30" and you are installing the door without stationary
glass, you only need to refer to (Diagram A) with (Packing List A).
b) If the width of your door is 30" and over, and you are installing the door and stationary glass
with support arm, you have to use (Diagram A and B) with (Packing List A and B) to
complete the installation
c) If the width of your door is 30" and over, and you are installing the door and stationary glass
with glass shelves, you have to use (Diagram A, and C) with (Packing List A, and C) to
complete the installation
Caulk
Level
Detailed Diagrams of Shower Door Components
Diagram A
Rev 2.1

Tools Required

Tape
Pencil
Measure
Caulk
Gun
Diagram B
TM
if you have any questions.
Drill bit
Phillips
Screwdriver
(Ø=5/16")
Electric
Drill
TM
will not
Drill bit
(Ø=3/16")
Hammer
Diagram C
2