Anzzi SB-AZ009WC Install & Operation Manual - Page 5
Browse online or download pdf Install & Operation Manual for Plumbing Product Anzzi SB-AZ009WC. Anzzi SB-AZ009WC 14 pages. Shower base
Also for Anzzi SB-AZ009WC: Installation & Care Manual (8 pages)
INSTALLATION INSTRUCTIONS
ATTENTION
The following steps are for the corner
●
shower tray.
STEP 1
Ensure that the floor and the studs
●
are at right angles.Provide a 5"×5" opening
in the subfloor for the drain.
The 2" PVC waste pipe should extend above
the surface of the sub-floor according to the
drain installation instructions and the height
of the Shower Tray.
Mark unit position on floor and through
●
drain opening.
Mark the locations of the studs on the flange
●
of the base.
These marks are used to verify base location
●
after drain is installed. (Fig 1)
The pipe height (A) shall be determined
●
according to the products on hand.
STEP 2
Place the tray into the designated position
●
so that the Drain Body drops around the
Drain Pipe and put the Shower Tray up
against the studs.
Level the tray and place marks on the studs
●
above the upper edge of the tile flange.
If the subfloor is not flat and level, use leveling
●
compound or mortar bed to ensure that the
base is level (shown in Step 5).(Fig 2)
90°
90°
2" PVC Waste Pipe
(See Product Chart for Drain Location)
Fig. 1
Level base in two directions
Fig.2
5"
(12.7 cm)
A
90°
(5"×5") Opening
3