Anzzi SD-AZ054-01 Series Installation & Operation Manual - Page 10
Browse online or download pdf Installation & Operation Manual for Indoor Furnishing Anzzi SD-AZ054-01 Series. Anzzi SD-AZ054-01 Series 18 pages. Tub door
Also for Anzzi SD-AZ054-01 Series: Install & Operation Manual (10 pages)
1.
Slide the Side Water Sealing Strip [02] to the groove
of Fixed Panel [04]. (Fig 3)
Note: Make sure the flange of Side Water Sealing
Strip [02] points inside after the Fixed Panel [04] is
secured to Wall Post [01]. (Fig 3.1)
Fig 4
8
Fig 3
round corner
1.
Attach Door Panel [05] to the Fixed Panel [04]
and secure by Top Shaft Seat [08] and Bottom
Shaft Seat [09] and 4 Screw ST4X35 [11] at
the top (Fig 4.1) and the bottom (Fig 4.2).
Note: Make sure the round corner is at the top.