Apollo 7100UL Installation Manual - Page 7

Browse online or download pdf Installation Manual for Gate Opener Apollo 7100UL. Apollo 7100UL 17 pages. Residential & medium duty commercial slide gate operator

The required depth of the
pad will vary from site to
site. Normally, the pad
should be at least 4" above
the surface and 18" below
(Figure A & B).
In harder soil or rock, pilings may be preferred (Figure C).
Conduit requirements should be considered in the planning stage. If electrical power is required, a separate conduit should be
installed for electrical only. A certified electrician should be consulted for the proper conduit material (Figure D & E).

PAD INSTALLATION

Driveway
5"
Fig. D
Direction of Opening
5"
24"
12"
24"
Pad Location
Pad Location
Fig. A
14"
AREA FOR CONDUIT
ENTRY
6
Fig. B
Fig. C
Note:
Allow the
concrete to cure
3"
as per the
directions on the
bag. The
mounting holes
for the operator
should be drilled
after the concrete
has cured.
Fig. E