Autometers Systems IC 995 Installation And Operating Manual - Page 4

Browse online or download pdf Installation And Operating Manual for Measuring Instruments Autometers Systems IC 995. Autometers Systems IC 995 10 pages. Electrical network analyser

6. Installation

6.1 Voltage Input
Voltage input should be less than 120% normal voltage (100V or 400V), otherwise
please use PT. On the voltage input, please use a 1Amp fuse. The wiring should be
as our diagrams on page 5.
Mode of wiring
1 element
1P2W
2 element
3P3W
3 element
3P4W
Match the voltage input with current input, and match the phase and phase
sequence (otherwise the values or signals will be incorrect).
6.2 Current Input
Normal current input is 5A, for more than 5A you must use Current transformers.
Make sure that you follow the connection details carefully when connecting the
voltage and current circuits to the meter.
6.3 Installation of Current Transformer
It is good practice to use a test shorting block where the external current
transformers can be linked out should the meter ever need replacing.
6.4 RS485 Modbus Wiring
The IC 995 is fitted with an RS 485 Modbus output. It has been designed to work
with Autometers protocol version V6.2.17, which enables up to 128 meters to be
connected on one Lan circuit. We advise using Beldon cable 9841 or 9842.

7. Features available

7.1 Main menu:
When the meter has voltage applied to the auxiliary
terminals (12 and 13) the meter will go through a
set up routine. Firstly the display will show
Autometers' front page then it will go to the first
screen (01), the line voltage screen.
Press Menu to view the various optional parameters.
6
8
MEASURE
HARMONIC
M
QUALITY
E
ENERGY
N
D.RELAYS
U
SOE
SETTING
: displays Line voltage, Phase to Phase, Line Current, Instantaneous
1 MEASURE
power, Power factor, Total power and Max demand
: displays Current and Voltage harmonic data to the 31st inst, wave
2 HARMONIC
form showing comparison of voltage and current and bar graph comparing
voltage and current
: displays Crest factor, THFF, K Factor, Unbalanced factor Voltage peak,
3 QUALITY
Voltage vector, Current vector
: displays Import and Export of Kwh, Kvarh and import of Kvah
4 ENERGY
: indicates status of digital relays
5 D.RELAYS
: displays time and date of relays which have been activated
6 SOE
7 SETTING
: programming of meter parameters
Selecting Individual parameters
: Move the highlighted feature up or down by pressing the arrows
Select Menu
marked
to the parameters you want to view.
: Press the return key
this will take you to the Line voltage screen.
7.2 MEASURE
Press the down key
to view individual parameters.
01. Phase to Neutral volts
02. Phase to Phase voltage
03. Phase and Total current
04. Instantaneous Kw
05. Instantaneous Kvar
06. Instantaneous Kva
07. Individual phase Power factor and Total Power factor
08. Total Instantaneous power Kw, Kvar, kva and Total Power factor
09. Maximum Demand
Volts
01
Volts
220.0
381.0
L1
V
L1-2
220.0
381.5
L2
V
L2-3
220.0
381.5
L3
V
L3-1
50.00
50.00
F
Hz
F
08- 14- 2009
17 45 55
08- 14- 2009
01. Phase to Neutral volts
02. Phase to Phase voltage
02
AMPS
03
04.99
V
L1
A
04.99
V
L2
A
04.99
V
L3
A
14.99
Hz
TTL
A
17 46 15
08- 14- 2009
17 56 11
03. Phase and Total current
7