ADEN POWERKIT GO Instruction And Assembly Manual - Page 13
Browse online or download pdf Instruction And Assembly Manual for Bicycle Accessories ADEN POWERKIT GO. ADEN POWERKIT GO 16 pages.
POWERPACK — ASSEMBLY INSTRUCTIONS
ADEN GmbH
BATTERY USE
Commissioning
To activate the support via the thumb lever or the twist grip, the crank
must be moved (pedal sensor).
The motor starts up by lightly operating the thumb lever or the twist grip.
The "further the turn", the stronger the support.
Attention:
When pedalling and giving "full throttle" at the same time,
the front wheel could rise unintentionally.
Using the Charger
The charger is plugged into a socket connected and then the
yellow plug with the Battery connected.
The red LED on the charger lights up - charging is in progress
If the battery is completely discharged, it takes about 2 hours
until the battery is fully charged again.
The green LED on the charger lights up
- Charging completed / battery charged
The battery can now be unplugged.
For longer storage, it is recommended
to have the battery charged to approx. 50%.
www.aden-sports.com
EN | P. 13