deconta D 110L Instruction Manual - Page 8

Browse online or download pdf Instruction Manual for Boiler deconta D 110L. deconta D 110L 14 pages. Water treatment boiler system

Sewage
Fine filter
Shower water connection
Function switch
Tank drainage
 Establish hose connections
Shower water connection
Sewage suction connection
Sewage water
 Optionally connect hose to fresh water supply or fill tank manually via filling port
 Connect to power supply
 Adjust temperature at heating rod (the heating rod works at all switch settings of
the function switch, but not before a sensor-controlled minimum fill level is
reached)
 At use of the automatic fresh water supply, the max. fill level is controlled by a float
switch
 the unit is now ready-to-operate
Instruction manual
Water treatment boiler system D 110 L

6 Initial operation

=> shower top
=> floor tub shower
=> canalisation
Filling port
wewage water suction port
Pre filter
Fresh water supply
shower – and
sewagepump
Heating rod with
thermostat
Seite 8