A. & H. Meyer NETBOX M4 Operation Manuals - Page 2
Browse online or download pdf Operation Manuals for Power Strip A. & H. Meyer NETBOX M4. A. & H. Meyer NETBOX M4 2 pages.
Loosen the connector
The connection of the "NETBOX" is managed via connectors or couplers.
According to DIN VDE 0627 06.86, the connection must be disconnected from the
mains before releasing the connector. The following chart indicates the procedure.
1. First pull out the safety contact plug from the wall-socket of the house electrics.
2. Then push a screwdriver centered between the connector and the locking of the
"NETBOX".
Lift the screwdriver slowly upwards, contrary to the extraction direction of the
connector.
3. Unplug the connector from the NETBOX.
Seite 2 von 2