Dell Force10 S2410-01-10GE-24P Manual - Page 20

Browse online or download pdf Manual for Server Dell Force10 S2410-01-10GE-24P. Dell Force10 S2410-01-10GE-24P 42 pages. Installing the s2410 system
Also for Dell Force10 S2410-01-10GE-24P: Application Note (6 pages), Quick Start Manual (31 pages)

Dell Force10 S2410-01-10GE-24P Manual
Step
Task
Position the cage nuts over the holes on each bracket flange and each rack post.
4
Figure 4-8. Four-post Rack-mounting with Cage Nuts, Step 4
Align the rack filler panel to the rear bracket and rack posts. Secure by inserting two screws into the hole in the
5
filler panel through to the holes in the rack post.
Figure 4-9. Four-post Rack-mounting with Cage Nuts, Step 5
20
|
Installing the S2410