Dell EMC PowerSwitch S6100-ON Installation Manual - Page 27

Browse online or download pdf Installation Manual for Switch Dell EMC PowerSwitch S6100-ON. Dell EMC PowerSwitch S6100-ON 48 pages.

Dell EMC PowerSwitch S6100-ON Installation Manual
For example, with 8 x 100G modules, create a two-port LAG using port 1/7 from port pipe 0 and port 1/4 from port pipe 2. With
16 x 40G modules, create a four-port LAG using port 1/12 from port pipe 1, 1/14 from port pipe 0, 2/11 from port pipe 2, and
2/13 from port pipe 3. With 4 x CXP + 4 x QSFP28 modules, create a two-port LAG using port 1/6 from port pipe 1 and port 2/7
from port pipe 2.
The following tables list the port to port pipe connectivity for the 8 x 100G modules, 16 x 40G modules, and 4 x CXP + 4 x
QSFP28 modules:
Table 6. Port and port pipe distribution—8 x 100G modules
Slot/Port
1/7, 1/8, 2/1, 2/2, 3/1, 3/2, 4/3, 4/4
1/5, 1/6, 2/3, 2/4, 3/7, 3/8, 4/5, 4/6
1/3, 1/4, 2/5, 2/6, 3/5, 3/6, 4/7, 4/8
1/1, 1/2, 2/7, 2/8, 3/3, 3/4, 4/1, 4/2
Figure 21. 8 x 100G module port pipes
Table 7. Port and port pipe distribution—16 x 40G modules
Slot/Port
1/13, 1/14, 1/15, 1/16, 2/1, 2/2. 2/3. 2/4, 3/1, 3/2, 3/3, 3/4,
4/5, 4/6, 4/7, 4/8
1/9, 1/10, 1/11, 1/12, 2/5, 2/6, 2/7, 2/8, 3/13, 3/14, 3/15,
3/16, 4/9, 4/10, 4/11, 4/12
1/5, 1/6, 1/7, 1/8, 2/9, 2/10, 2/11, 2/12, 3/9, 3/10, 3/11, 3/12,
4/13, 4/14, 4/15, 4/16
1/1, 1/2, 1/3, 1/4, 2/13, 2/14, 2/15, 2/16, 3/5, 3/6, 3/7, 3/8,
4/1, 4/2, 4/3, 4/4
Figure 22. 16 x 40G module port pipes
Port pipe
0—red
1—orange
2—green
3—blue
Port pipe
0—red
1—orange
2—green
3—blue
S6100–ON installation
27