Dell S6000-ON Getting Started Manual - Page 19
Browse online or download pdf Getting Started Manual for Switch Dell S6000-ON. Dell S6000-ON 26 pages. Open networking
Also for Dell S6000-ON: Troubleshooting Manual (29 pages), Installation Manual (41 pages)
Two-Post Flush-Mount Configuration:
1 For this configuration, remove the castings from the front side of each
ReadyRails assembly. Refer to
remove the two screws from each front flange ear (on the switch side of the
rail) and remove each casting. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
Figure 4-2. Two-Post Flush-Mount Configuration
2 Attach one rail to the front post flange with two user-supplied screws. Refer
to
Figure
4-2, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. Refer
to
Figure
4-2, item 3.
4 Repeat this procedure for the second rail.
16
Installation
Figure
4-2, item 1. Use a Torx driver to