Miele CS 1122 Operating And Installation Manual - Page 36

Browse online or download pdf Operating And Installation Manual for Cooktop Miele CS 1122. Miele CS 1122 40 pages. Ceramic combiset
Also for Miele CS 1122: Operating And Installation Instructions (40 pages), Operating And Installation Instructions (40 pages), Operating And Installation Instructions (40 pages), Operating And Installation Instructions (48 pages), User Manual (45 pages), Operating And Installation Instructions (40 pages)

Miele CS 1122 Operating And Installation Manual

Electrical connection

,
CAUTION: Before installation or
servicing, disconnect the power
supply by either removing the fuse,
shutting off the main power supply
or manually "tripping" the circuit
breaker.
Installation work and repairs should
only be performed by a qualified
technician in accordance with all
applicable codes and standards.
Repairs and service by unqualified
persons could be dangerous and
the manufacturer will not be held
responsible.
Before connecting the appliance to
the power supply, make sure that
the voltage and frequency listed on
the data plate correspond with the
household electrical supply. This
data must correspond to prevent
appliance damage. Consult an
electrician if in doubt.
Only operate the combiset after it
has been installed into the
countertop.
Installer:
Please leave these instructions with
the consumer.
36
Power supply
^ Be sure your electrical supply
matches the data plate.
The combiset is equipped with a
flexible metal conduit encasing 3 wires
ready for connection to a grounded
power supply.
A dedicated line and junction box
should be used to connect the
combiset to a 15 A circuit.
Black wire: connect to L1 (hot)
Red wire:
connect to L2 (hot)
Green wire: connect to GND (ground)
240 V, 60 Hz, 15 A fuse rating.
Be sure the power outlet is accessible
after installation.
For further information, see the wiring
diagram provided with the appliance.
, WARNING:
THIS APPLIANCE MUST BE
GROUNDED!