ABB AC500 Series Installation And Configuration Manual - Page 17

Browse online or download pdf Installation And Configuration Manual for Industrial Equipment ABB AC500 Series. ABB AC500 Series 20 pages. Scalable plc for individual automation, connection of a dcf77 radio clock to an ac500 via ascii protocol
Also for ABB AC500 Series: Application Example (8 pages), Manual (18 pages)

ABB AC500 Series Installation And Configuration Manual
1.4.2.4
Save the project

1.4.3 Configure the I/O module

The types and order of modules in the Automation Builder project must match the real hard-
ware configuration.
The position of the modules in the device tree can be changed by drag and drop.
2021/05/14
Select menu "File è Save Project".
Alternatively, select the save icon
Alternatively, press [Ctrl] + [S].
3ADR010584, 2, en_US
Getting started with AC500 V3 products
Example project for central I/O expansion > Configure the I/O module
in the tool bar.
17