ABB ACH580-01 Series Quick Installation And Start-Up Manual - Page 7

Browse online or download pdf Quick Installation And Start-Up Manual for Industrial Equipment ABB ACH580-01 Series. ABB ACH580-01 Series 17 pages. Base drive replacement
Also for ABB ACH580-01 Series: Manual (16 pages), Instructions Manual (8 pages), Instructions Manual (7 pages), Quick Installation And Start-Up Manual (17 pages), Quick Installation And Start-Up Manual (17 pages)

ABB ACH580-01 Series Quick Installation And Start-Up Manual
2a
3.
Connect the power cables. For the tightening torques, refer to
Slide the conductors through the conduit.
Connect the conductors:
Connect the phase conductors of the motor cable to terminals T1/U, T2/V and T3/W. Connect the twisted shield of
the cable to the grounding terminal. (3a)
Connect the grounding conductor to the grounding terminal. Connect the phase conductors of the input power
cable as for the motor cabling. Use terminals L1, L2 and L3
Frames R8...R9: If you do not use parallel phase conductors
the upper pressure plates. If you use parallel phase conductors, put the first conductor under the lower pressure
plate and the second under the upper pressure plate.
If used, connect the brake resistor or brake chopper cables.
Frames R6...R9: After you connect the power cables, install the shroud on the terminals (3c).
R1...R4
INPUT
3b
L1
L2
L3
R6...R9
3b
4.
Frame R5: Install the cable box plate (4a) and shroud (4b).
R5
4a
2b
PE
BRAKE RES
MOTOR
3a
R+
R-
T1
T2
T3
UDC+
U
V
W
3a
Conduit
Terminal data for the power cables
.
(3b)
,
ABB recommends that you put the conductors under
R5
3b
R6...R9
4b
7
.
3a
3c