ABB ACS580-01 drives Quick Installation And Start-Up Manual - Page 5

Browse online or download pdf Quick Installation And Start-Up Manual for Industrial Equipment ABB ACS580-01 drives. ABB ACS580-01 drives 17 pages. Frequency converter. nec types
Also for ABB ACS580-01 drives: Manual (16 pages), Quick Installation And Start-Up Manual (17 pages)

ABB ACS580-01 drives Quick Installation And Start-Up Manual
R6...R9
1
8. Attach a residual voltage warning sticker to the drive in the local language
9. Make sure that the drive is compatible with the grounding system
You can connect all drives to a symmetrically grounded TN-S system (center-grounded wye). If you install the drive to a
different system, you must remove the EMC screw (disconnect the EMC filter) and/or remove the VAR screw (disconnect
the varistor circuit).
Frame size
Symmetrically grounded
TN-S systems (center-
grounded wye)
R1...R3
Do not remove EMC or
VAR screw.
R4...R5
Do not remove EMC or
VAR screw.
R6...R9
Do not remove EMC or
VAR screw.
1) A residual current device must be installed in the supply system.
2) ABB does not guarantee the EMC category or the operation of the ground leakage detector built inside the drive.
10. Measure the insulation of the power cables and the motor
Measure the insulation of the input cable before you connect it to the drive. Obey
the local regulations.
Measure the insulation of the motor cable and motor when the cable is
disconnected from the drive. Measure the insulation resistance between each
phase conductor and the PE conductor. Use a measuring voltage of 1000 V DC. The
insulation resistance of an ABB motor must be more than 100 Mohm (reference
value at 25 °C [77 °F]). For the insulation resistance of other motors, see the
manufacturer's instructions. Moisture inside the motor casing decreases the
insulation resistance. If you think that there is moisture inside the motor casing, dry
the motor and do the measurement again.
2
Corner-grounded delta
and midpoint-grounded
delta systems
Remove EMC screw.
Note: The drive is not
evaluated for use on
these systems by IEC
standards.
Remove EMC DC screw.
M8x6
IT systems (ungrounded
or high-resistance
grounded)
Remove EMC and VAR
screws.
Remove EMC screws
(2 pieces) and VAR screw.
Remove EMC screws
(2 pieces) and VAR screw.
ohm
U1-PE, V1-PE, W1-PE
5
1) 2)
TT systems
Remove EMC and VAR
screws.
Remove EMC screws
(2 pieces) and VAR screw.
Remove EMC screws
(2 pieces) and VAR screw.
U1
M
V1
3~
W1
PE