ALLpaQ Packaging Group Genesis 250 C Operator User Manual - Page 10

Browse online or download pdf Operator User Manual for Packaging equipment ALLpaQ Packaging Group Genesis 250 C. ALLpaQ Packaging Group Genesis 250 C 13 pages.

ALLpaQ Packaging Group Genesis 250 C Operator User Manual
Chapter 3 - All ALLpaQ Genesis 50 - 250 E & C Versions
3.1 Moving the Container
Pallet base may be moved using manual handling equipment such as Fork lift truck or manual
pallet jack.
ALLpaQ Genesis 200E
Fig 1.1
Both units are based upon the same foot print and both pallet bases allow a two way entry on the
long side (see Fig 1.1 & 1.2).
3.2 Unfolding the container for use
This instruction is applicable to all versions.
Fig 2.1
Fig 2.3
Erect by lifting the top of the long sidewall by pulling towards the body
(Fig 2.3).
Repeat procedure for the opposing long sidewall before erecting the short sidewalls in sequence
and locking into position (Fig 2.4 and 2.5)
Fig 1.2
ALLpaQ Genesis 250 C
Fig 2.2
DO NOT attempt to lift by yellow catches to avoid damage.
Fig 2.4
Manual V1 - (Sept 14
th
2012)
Open the yellow catches to
release the lid from the base (Fig
2.2).
Simply lift the lid from the base
unit and store safely away from
marked walk way (Fig 2.1).
Fig 2.5