Arch hth easiflo 1 75876 Operator's Manual - Page 4
Browse online or download pdf Operator's Manual for Swimming Pool Filter Arch hth easiflo 1 75876. Arch hth easiflo 1 75876 11 pages.
Following the procedure outlined below will ensure a
smooth start-up of the Easiflo 1 Chlorinator. For
seasonal operation, perform this procedure each
spring.
IMPORTANT!!
Do NOT put Easiflo
chlorinator during the start-up
operation.
INLET WATER FLOW
The inlet water flow system is designed to provide a
steady side-stream of clean filtered pool water to the
chlorinator.
1.
Switch on the pool recirculation system, and open
all valves to the chlorinator. Leave lid closed.
2.
Adjust Inlet flow on flow indicator to 1.5lt/min.
Wait 10 seconds and open lid slowly.
3.
Check to see that the wave nozzle is making a
wave that rises into the Briquette grid. Remove the
grid to see if water is flowing from the Solids
Removal Nozzle.
4.
Check all lines leading to the Chlorinator for leaks.
Hand tighten all fittings if any leaks are found.
OUTLET WATER FLOW
The float on the Discharge Valve rises with the water
level and allows the venturi suction to draw the
chlorinated water into the pool recirculation system as
the Discharge Tank fills with water. When the water
level drops, the float falls, shutting off the valve. The
Discharge Valve also contains a check valve to prevent
pool water from backing up into the Discharge Tank.
Use the following procedure to ensure that the outlet
water flow system is operating properly.
1.
With the briquette hopper and dissolving cup of the
chlorinator temporarily out of the way, fill the
Discharge Tank with sufficient water to open the
Discharge Valve – use a hose or pail.
2.
The float should rise, opening the Discharge Valve,
allowing water to be drawn out by the Easiflo®
venturi system.
3.
Check the system for leaks. If small air bubbles are
visibly moving, there may be an air leak. Tighten
the connectors and make sure that the tubing was
properly installed in the fittings. (NOTE: Air bubbles
near the Easiflo 1 Chlorinator body that do not
move are normal and do not indicate leaks.)
4.
Check for air leaks after the Discharge Valve
closes.
PRE-START-UP CHECKLIST
®
Briquettes in the
Removable
Briquette
Grid
2
Solids
Removal
Nozzle
Wave
Nozzle
Inlet Flow
Outlet Flow
to Venturi
Discharge
Valve
Discharge
Float
Hopper
Lid
Briquette
Hopper
Dissolving
Cup
Emergency
Shut Off
Float