Cisco ONS 15454 Install - Page 31

Browse online or download pdf Install for Server Cisco ONS 15454. Cisco ONS 15454 32 pages. Four-shelf and zero-shelf bay assembly
Also for Cisco ONS 15454: Installation Instructions Manual (22 pages), Install (32 pages), Unpacking And Installing (42 pages), Unpacking And Installing (40 pages)

Cisco ONS 15454 Install
Chapter 1
Install the Shelf and Backplane Cable
NTP-A13 Perform the Shelf Installation Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures Applicable procedures in Chapter 1
Required/As Needed
Onsite/Remote
Security Level
The covers are an integral part of the safety design of the product. Do not operate the unit without the
Warning
covers installed.
Step 1
Complete
Table 1-5
Description
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly, page 1-4
NTP-A2 Install the Shelf Assembly, page 1-5
NTP-A3 Open and Remove the Front Door, page 1-6
NTP-A4 Remove the Backplane Covers, page 1-7
NTP-A5 Install the EIAs, page 1-7
NTP-A6 Install the Power and Ground, page 1-9
NTP-A7 Install the Fan-Tray Assembly, page 1-10
NTP-A119 Install the Alarm Expansion Panel, page 1-12
NTP-A8 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections, page 1-15
NTP-A120 Install an External Wire-Wrap Panel to the AEP, page 1-16
NTP-A9 Install the Electrical Card Cables on the Backplane, page 1-22
NTP-A10 Route Electrical Cables, page 1-23
NTP-A11 Install the Rear Cover, page 1-23
Complete the
Step 2
Complete the
Step 3
Continue with
Step 4
Stop. You have completed this procedure.
March 2005
Use this procedure to perform a shelf installation acceptance test.
Voltmeter
Required
Onsite
None
Table 1-5
by verifying that each applicable procedure was completed.
Shelf Installation Task Summary
"DLP-A32 Inspect the Shelf Installation and Connections" task on page
"DLP-A33 Measure Voltage" task on page
Chapter 2, "Install Cards and Fiber-Optic Cable."
NTP-A13 Perform the Shelf Installation Acceptance Test
17-39.
Cisco ONS 15454 Procedure Guide, R5.0
Completed
17-39.
1-31