Acoustic Signature Typhoon NEO Instruction Manual - Page 5

Browse online or download pdf Instruction Manual for Turntable Acoustic Signature Typhoon NEO. Acoustic Signature Typhoon NEO 12 pages.
Also for Acoustic Signature Typhoon NEO: Instruction Manual (12 pages)

Acoustic Signature Typhoon NEO Instruction Manual
Mounting the subplatter
Take away the cover strip over the bearing hole.
Insert the subplatter carefully into the bearing.
Take care that it slides in slowly and easily.
Do not let the subplatter drop into the bear-
ing hole, as this may damage the bearing.
Turn the subplatter by hand to make sure it spins
easily.
Mounting the belts
Place the three provided belts around the pulleys
and the subplatter as shown in the pictures
above. Each belt must be placed around two adja-
cent pulleys and the subplatter.
Start mounting the first belt in the lowest groove
of the backside pulley.
Do not use sharp tools or pointed tweezers. This
may damage belts, subplatter and pulleys.
Subteller montieren
Entfernen Sie den Schutzaufkleber über der La-
gerbohrung.
Setzen Sie nun den Subteller vorsichtig in die La-
gerbohrung ein und senken ihn ab. Achten Sie da-
bei darauf, dass er leicht und ohne erkennbaren
Widerstand ins Lager gleitet
Lassen Sie den Subteller nicht in die La-
gerbohrung fallen, da dies das Lager be-
schädigen kann.
Drehen Sie den Subteller von Hand und prüfen
Sie, ob er sich leicht drehen lässt.
Antriebsriemen montieren
Legen Sie die drei mitgelieferten Riemen einzeln
um jeweils zwei benachbarte Pulleys und den
Subteller. Verlegen Sie einen Riemen je Nut im
Pulley, beginnend mit der untersten Nut (oberste
Nut bleibt frei).
Verwenden Sie keine scharfen Werkzeuge oder
spitzige Pinzetten, da dies zur Beschädigung von
Riemen, Subteller führen kann.
5