Altron AL-761-N Instruction Manual - Page 14
Browse online or download pdf Instruction Manual for Industrial Equipment Altron AL-761-N. Altron AL-761-N 19 pages.
the Press again the start switch for process stop or automatically process will be
stopped after process remained preset process value on display.
※The processing operation will be stopped after a few seconds from
start due to an imperfection to the air drawing process while
showing E-2.
In this case, press the Air Draw button again to restart the air
drawing process.
※To avoid mineral build up in the unit inside, the unit will change electrolysis
water pass for every 1 hour process sequence and the process operation
will pause its operation while displaying
● On the initial operation, please carefully check for any water leakage around the
diverter and connection points. If water leakage is noted, please stop the process and
fix the incorrect situation. If you find something that has failed, press process button for
process to stop and close water run. Check the pipe connection, packing and please
try again from the first step.
HOW TO USE THE TEST PAPER (IODIDE POTASSIUM STARCH PAPER)
FOR DETERMINING THAT A STRON ELECTROLYZED WATER HAS BEEN
PRODUCED:
A simple test method is using the attached iodide potassium starch test paper.
Take one strip of test paper and gently put it in the strong acidic water and compare it
to the color test sheet. If the color is lighter than what is indicated on the color test
sheet, mix more pure salt, over the 400 line, for the electrolysis agent liquid.
Showing violet color indicates that the water has been suitably electrolyzed.
①
Showing a darker coloring that the test sheet indicates a stronger electrolyzed water has
②
been produced. In order to correct this condition, please dilute the electrolysis agent
for around 20 seconds.
14