Andrew 960 Class II Montagehandleiding - Pagina 4
Blader online of download pdf Montagehandleiding voor {categorie_naam} Andrew 960 Class II. Andrew 960 Class II 9 pagina's. Antenna system
GROUND POLE INSTALLATION (96cm System)
2.88" or
3.00" O.D.
C
ANT
41.5"
1" to 2"
SLOPE FOR
36.4"
WATER RUN OFF
72"
GRADE
40"
#3 REBAR x
DIA. OF PIER
d
INSERT THRU HOLE
BELOW
MIN.
IN TUBE & CENTER
FROST LINE
DIA.
STANDARD
PIER FOUNDATION
PIER FOUNDATIONS
Exposure "B"
Exposure "C"
ANT WIND VEL. DIM "d" CONC VOL.
DIM "d"
80 MPH
7"
0.9
10"
90 MPH
8"
1.2
13"
96cm 100 MPH
10"
1.8
15"
110 MPH
11"
2.2
17"
125 MPH
14"
3.5
20"
POLE SPECIFICATIONS:
Ground Pole "A" = 3.00 O.D. x 10 G.A. x 72" Steel
Ground Pole "B" = 2
O.D. x .203 Wall x 72" Steel ASTM 120 Mech Tubing (2
NOTE:
Pole not supplied and must be field drilled
" dia. for #3 rebar and drilled .218 for
screw (see Page 7) and galvanized or painted for protection.
1 - Pole and foundation design based on the following criteria:
a) Uniform building code exposure B or C and 1.5 stability factor.
b) Vertical soil pressure of 2000 pounds per square foot.
c) Lateral soil pressure of 400 pounds per square foot.
d) Concrete compressive strength of 2500 pounds per square inch in 28 days.
2 - CAUTION - The foundation design shown does not represent an appropriate design for any specific locality since soil conditions vary
and may not meet design criteria given in Note 1. You should consult a local professional engineer to determine your soil conditions
and appropriate foundation.
36.4"
NOTE:
72"
50" depth may be
increased,
concrete and
length of rebar
will increase
accordingly.
#3 REBAR x DIA. OF PIER, INSERT
THRU HOLE IN TUBE & CENTER
(4)#3x24"MIN.
d
AT 90
o
APART
MIN.
(SEE NOTE)
DIA.
DEEP FROST
LINE FOUNDATION
DEEP FROST LINE FOUNDATIONS
Exposure "B"
Exposure "C"
CONC VOL.
DIM "d'
CONC VOL.
DIM "d"
CONC VOL.
1.8
7"
1.2
7"
3.0
7"
1.2
8"
4.0
7"
1.2
10"
5.2
7"
1.2
11"
7.2
9"
1.9
14"
Sch. 40)
-20 self tapping grounding
3
2.88" or
3.00" O.D.
1" to 2"
SLOPE FOR
WATER RUN OFF
GRADE
50"
(SEE
NOTE)
2"
APPROX.
2"
BELOW
FROST LINE
GROUND
Clamp Bolts
POLE
1.2
"A"
1.5
2.4
"A" or
2.9
"B"
4.7
"B" Only
Ground Pole
Must Be
Vertical In
All Directions
Within .19 Inches
At Top (0.3ß)
Bubble
Level
AZ-EL MOUNT WITH M8 INSERT AND SET SCREW
IMPORTANT
M8 x 20 mm Hex Head Set Screws are recommended for schedule 40 (.203 wall) mast and
NOT RECOMMENDED for mast with a wall thickness less than 10 ga (.134) such as
Non-Penetrating Roof Mounts and Roof/Wall Mounts
Figure 1.0 (AZ-EL Mount with M8 Insert and Set Screw)
Once fine tuning is complete and all Clamp Bolts are equally torqued to 18 ft-lbs. in
accordance with 8000842 manual, then install the two M8 x 20 mm Hex Head Set Screws
supplied. Install one in each clamp half as shown in Fig. 1.0. Torque each M8 x 20 mm
Hex Head Screw to 15 ft-lbs. Repeat torque to insure 15 ft-lbs. has been reached on both
screws.
See Manual 8000842 for additional instructions not shown here.
14
.
M8 x 20 mm
Hex Head
Set Screw
M8 Insert
Half Clamp