Atlantic SP2600 Producthandleiding - Pagina 3
Blader online of download pdf Producthandleiding voor {categorie_naam} Atlantic SP2600. Atlantic SP2600 12 pagina's.
Gravel-Filled Reservoirs
Because Eco-Blox are 96% void space, they allow the reservoir to be dug to just the size
required for the water volume needed. Backfilling with gravel fills 65% of the reservoir
with stone, leaving only the 35% that remains between the stones available for water
storage. This means that a gravel-filled basin will need to be three times larger than an
Eco-Blox basin to hold the same volume of water. That's a lot more time, excavation,
additional soil removed, additional gravel to fill the hole, labor costs and cleanup.
For Larger Basin Volumes
For installations where a larger basin volume or a deeper basin is required, Atlantic offers
Pump Vault Extensions for both the PV1800 and PV2300. Each additional layer of Eco-Blox
increases the depth of your excavation by 17.5"; use one Extension for each additional layer.
Transitional Volume x 3 = Minimum Reservoir Volume
(when filled with Eco-Blox)
Transitional Volume x 9 = Minimum Reservoir Volume
(when filled with gravel)
3