AFL Hyperscale H-Series 7RU Housing Installatiehandleiding - Pagina 13
Blader online of download pdf Installatiehandleiding voor {categorie_naam} AFL Hyperscale H-Series 7RU Housing. AFL Hyperscale H-Series 7RU Housing 16 pagina's.
H-Series 7RU Housing
Single Splice Cassette
Splice holder
position 1
Wrap the aramid yarn
around the stud and
tighten by using the
spacer and nut.
Splice holder
position 2
1) Separate the pigtails into two bundles of 12 as per mapping requirements.
8a
Position of Port 1 of the cassette is located at the bottom.
2) Proceed to feed the incoming cable at the top of the cassette and secure using the gland.
We recommend feeding up to 1.2 meters of cable.
3) Proceed to strip the cable.
Leave up to 30mm of aramid yarn to secure in the holders as shown above.
4) Separate the fibers in the incoming cable to match the pigtail bundle and proceed to splice.
5) Once complete, coil the first bundle in the cassette clockwise and secure the splice protector in the bottom
splice holder (position 2).
6) Repeat the process anti-clockwise for the second bundle and secure the splice protector in the top splice
holder (position 1).
7) Close the cassette and position it back in the housing.
13
© AFL Hyperscale. All rights reserved
Series