6. To lock the bolts in position turn the bolt counter-clockwise until the tab on the
bolt head is vertical to LOCK mark.
Note: Do not use excessive force - hand tighten only.
7. Trim the length of the locking bolts if required.
8. Fit the red full flush air hose and the blue reduced flush air hose to the faceplate.
9. Push the faceplate into the locking plate until it locks into place.
Note: Cut the excessive parts of the air hose if necessary and
fix it onto the tank fastener.
10. The cistern should now be ready to use.
A3-2 :
Remote locking plate installation
1. 7~20mm thickness is recommended for
the finished wall and at least 80mm gap
for faceplate.
2. Use four screws to fix locking plate by
four pinch plates to the wall.
3. Follow the steps 8-10 of A3-1 to complete the
faceplate installation.
A3-3 :Remote installation of flush button shield
1. Add a nog to studs where you want to install the faceplate to mo
2. Drill 4 holes with diameter of 10mm and depth
of 16mm are needed to locate the locking plate
bolts.
Drill 10mm hole for air hose on the side of sheild.
3. Mount the shield on nog using self-tapping screws.
4. Do not cut the shield as the full lenght of shield is
needed to accomodate the minimum space that is
required for faceplate.
5. Follow the steps 5-10 of A3-1 to complete the
faceplate installation.
A3-4 :Press from front: fix four plates with screws
1. Cut the cable tie of the air hose and pull it out from the tank
2. Ensure the tank is accessable through front or top for future mai n tenance.
3. Fix the four plates with screws and then fix the locking plate.
4. No direct contact between the faceplate and the tank as the 80mm gap is
required to support the faceplate thickness.
5. 7~20mm thickness recommended for the finished wall.
6. Follow the steps 8-10 of A3-1 to complete the faceplate installat i on.
1310920-A02-A
Locking plate bolt
Connect to blue
air hose (half flush)
Fastener
Connect to red
air hose (full flush)
Faceplate
Locking plate
Full flush
Pinch plates
Locking plate
Screw
unt the shield on.
177
90
Position of locking
bolt through holes on nog
Locking plate
Air hose
-6-
Faceplate
Locking plate
Locking
Pinch plate
plate
Finished
Air hose
wall
Air hose
ø10 mm hole through hose
Fix sheild in wall
ø10 mm hole, depth
16mm locking bolt through
Space required
Pinch plate
7~20mm recommended
Finished wall
At least 80mm
gap reserved
Half
Flush
7~20mm
recommended
At least 80mm
gap required
Nog
Finished
wall
72