Dell Force10 S2410-01-10GE-24P Handmatig - Pagina 20

Blader online of download pdf Handmatig voor {categorie_naam} Dell Force10 S2410-01-10GE-24P. Dell Force10 S2410-01-10GE-24P 42 pagina's. Installing the s2410 system
Ook voor Dell Force10 S2410-01-10GE-24P: Toepassingsnotitie (6 pagina's), Snelstarthandleiding (31 pagina's)

Dell Force10 S2410-01-10GE-24P Handmatig
Step
Task
Position the cage nuts over the holes on each bracket flange and each rack post.
4
Figure 4-8. Four-post Rack-mounting with Cage Nuts, Step 4
Align the rack filler panel to the rear bracket and rack posts. Secure by inserting two screws into the hole in the
5
filler panel through to the holes in the rack post.
Figure 4-9. Four-post Rack-mounting with Cage Nuts, Step 5
20
|
Installing the S2410