ALLpaQ Packaging Group Genesis 200E Gebruikershandleiding - Pagina 8
Blader online of download pdf Gebruikershandleiding voor {categorie_naam} ALLpaQ Packaging Group Genesis 200E. ALLpaQ Packaging Group Genesis 200E 13 pagina's.
2.4 Fitting the bag
Before fitting the bag make sure you can gain access to the base by opening the drop door
situated at the front of a standard unit (Fig 4.1). Note units may be supplied with two drop doors.
Fig 4.4
Fig 4.5
Fig 4.1
Place the fingers in the slots provided and lift upwards (Fig
4.2), pull towards your body to unhinge the door; allow the
door to rest against the front wall of the container (Fig 4.3).
For full instruction on fitting the bag (see1.4 above).
Once the bag has been fitted correctly and filling is complete
in accordance with bag suppliers instructions a foam
shipping pad is placed over the bag for additional protection
during transportation and storage (Fig 4.5).
ALLpaQ recommend that foam dunnage (Fig 4.5) always be
used during shipment in its range of containers. If foam
dunnage has not been supplied contact ALLpaQ
immediately.
The foam dunnage is simply placed on top of the filled bag
before fitting and securing the lid for storage and
transportation.
Each pad is designed to bag specification to accommodate
the inlet tubing.
2.5 Fitting the lid
Each operator lifts the lid until square over the container.
Lock catches should be open (see Fig 2.2 above).
Push lid down over all four corners then slide the lid handles
to the locked position.
Fig 5.1
Manual V1 - (Sept 14
Fig 4.3
Fig 4.2
th
2012)