Digisol DG-GR1010 Snelle installatiehandleiding - Pagina 5

Blader online of download pdf Snelle installatiehandleiding voor {categorie_naam} Digisol DG-GR1010. Digisol DG-GR1010 16 pagina's. Gepon onu router with 1 pon and 1 giga port

Digisol DG-GR1010 Snelle installatiehandleiding

Installation

2:1 Installation Requirements
To avoid equipment damage caused by improper use and personal injury,
please observe the following precautions:
Do not place the device near water or in damp places, in order to
prevent water or moisture from entering the device.
Do not place the device in an unstable place, avoid falling damage to
equipment.
Make sure that the supply voltage of the device matches the required
voltage value.
Do not open the equipment chassis without permission.
Unplug before cleaning the power plug; prohibit the use of liquid cleaning.
Installation Environment Requirements
ONU equipment must be installed in the interior, and to ensure the
following conditions:
Confirmation at the ONU installation at sufficient space to facilitate
cooling machine.
ONU suitable operating temperature of -10
humidity 10% to 90%.
Electromagnetic Environment
ONU equipment in use can be affected by external electromagnetic
interferences, such as radiation and conduction through the impact on the
device, this should note the following:
Device workplace should avoid radio transmitters, radar stations, and
high-frequency interference from power equipment.
Users cable typically require alignment indoors if outdoor lightning
traces measures should.
Equipment Installation
ONU product is a fixed configuration cassette equipment, site equipment
installation is relatively simple. Simply install the device on a specified place,
connecting the upstream fiber subscriber line connections, connect the
power cable. Actual operation is as follows:
°C
~55
°C
,