Cisco SCE8000 GBE Installing - Pagina 17
Blader online of download pdf Installing voor {categorie_naam} Cisco SCE8000 GBE. Cisco SCE8000 GBE 21 pagina's. 10gbe platform
Ook voor Cisco SCE8000 GBE: Snelstarthandleiding (25 pagina's), Configuratiehandleiding (18 pagina's), Procedures voor verwijdering en vervanging (36 pagina's)
Chapter 4 Installing the Cisco SCE8000 Chassis
To install the Cisco SCE8000 chassis in the equipment rack, perform these steps:
Position the chassis in the rack as follows:
Step 1
If the front of the chassis (front panel) is at the front of the rack, insert the rear of the chassis between
•
the mounting posts.
If the rear of the chassis is at the front of the rack, insert the front of the chassis between the
•
mounting posts.
Align the mounting holes in the bracket (and optional cable guide) with the mounting holes in the
Step 2
equipment rack. (See
Use a tape measure and level to choose and mark the position that the chassis is to be installed in the
Step 3
rack. Make a mark at equal height on both sides of the rack. This helps ensure that the chassis is installed
straight and level.
Figure 4-14
Install the eight (four per side) 12-24 x 3/4-inch or 10-32 x 3/4-inch screws through the holes in the
Step 4
bracket and into the threaded holes in the equipment rack posts.
Use a tape measure and level to verify that the chassis is installed straight and level.
Step 5
OL-21054-04
Figure
4-14.)
Installing the Cisco SCE8000 Chassis in the Rack
FA N ST
SCE 8000
AT US
-SCM -E
SC M
1
OPT ICAL
BYP ASS
CON SOL
E
POR T 1
10 100
STA TUS
LINK
1000
OPT ICA
ACTI VE
L BYP ASS
SCE 8000
-SCM -E
SC M
2
OPT ICAL
BYP ASS
CON SOL
E
POR T 1
10 100
STA TUS
LINK
1000
OPT ICA
ACTI VE
L BYP ASS
SCE 8000
-SIP
SIP
3
SPA- 1X10
GE-L -V2
SPA- 1X10
GE-L -V2
4
TX
SC E8 00
TX
0- FA N
TX
RX
A C
TX
CTR L
B
D
RX
A B
RX
C
RX
D
STA TUS
OP TIC AL
BY PA SS
OP B-S
1
CE 8K -M
M
SCE8 000
EXTE NDED
SERV ICE
CONT ROL
MOD ULE
MA STE R
SYS TEM
POW ER
SCE8 000
EXTE NDED
SERV ICE
CONT ROL
MOD ULE
MA STE R
SYS TEM
POW ER
SPA- 1X10
GE-L -V2
SPA- 1X10
GE-L -V2
Cisco SCE8000 10GBE Installation and Configuration Guide
Installing the Chassis in the Rack
4-17