Air & Allied Sales MP55AK Instrukcja obsługi - Strona 6

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Narzędzia Air & Allied Sales MP55AK. Air & Allied Sales MP55AK 11 stron. Air nipper

・The exchange method of a main part A(①) piston(③)  return spring(⑩)
(1) Intercept an air source of supply.
(2) Remove an air hose from a main part. (Refer to Fig. 1)
(3) Remove screw pin(⑥) and nut(⑮) and remove blades from a main part. (Refer to Fig. 2)
(4) Remove the main part C(22). (It turns to a clock and an opposite direction)
※Keep in mind that a piston may jump out at this time.
(5) Carry out a grease rise for the inside of the new main part A(①).
(6) Carry out the grease rise of the inside and O ring portion of new piston(③) (with O ring(⑪)).
(7) Put new return spring(⑩) into the main part A.
(8) Put in new piston(③) which carried out the grease rise, fasten the main part C and complete.
※1.In exchange of the main part A, take the dirt of the existing piston(③),
carry out a grease rise at the inside of a piston, and O ring portion,
and include in the existing spring and (5).
2.In exchange of only a spring, please clean the existing main part A
and the existing piston finely, carry out a grease rise
and include in a required place with a new spring.
3.In exchange of only a piston, clean and grease rise the inside of the existing
main part A finely, and incorporate with the existing spring.
※Grease rise part
・The inside of main part A
※Recommendation lubricant (grease rise) : Shell Alvania Grease RA-J
 ・The inside of a piston
6/11
Air & Allied Sales (Pacific) Pty Ltd
・Piston O ring portion
www.air-allied.com.au