Alen AMS09 9000 BTU AND 14.5 SEER Instrukcja instalacji - Strona 16

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Klimatyzator Alen AMS09 9000 BTU AND 14.5 SEER. Alen AMS09 9000 BTU AND 14.5 SEER 17 stron. Split type room air conditioner 9000 btu and 14.5 seer/12000 btu and 13.5 seer

AIR PURGE AND TEST OPERATION

2. Gas Leak Check

Make sure no gas comes out
from the connections with a
leak detector or soap water.
CAUTION
A: Lo packed valve
C and D: end of Evaporator (indoor) unit connection.

3. Test Operation

Perform test operation after completing gas leak check and installation.
Connect the power. Push the "COOL" button on the control panel to
i.
begin testing.
Check if all the functions work well while testing the air conditioner.
ii.
A protection feature prevents the air from being activated for about 3
minutes when it is restarted immediately after operation or when the
power switch is switch on.
Push the "COOL" button again till the running light switch off after
iii..
finishing the test operation.
MANUAL BUTTON
15
Evaporator (indoor)
unit check point
Evaporator (indoor)
unit check point
B: Hi packed valve
AUTO / COOL
D
C
A
B