Dreamline ENIGMA-Z SHDR-62487610 Series Instrukcja instalacji - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Produkt hydrauliczny Dreamline ENIGMA-Z SHDR-62487610 Series. Dreamline ENIGMA-Z SHDR-62487610 Series 20 stron. Shower door & tub door
12 .
Place the Stationary glass (#02) with the Upper Guide Rail (#03) onto the threshold with the
notch fitting into the
note that the Stationary Glass (#02) installs on the outside and the Upper guide rail (#03) goes on
the inside of the shower).
The Guide Block (#12) must be
installed squarely on the threshold
and stationary panel glass
90°
13.
Re-position the Stationary glass (#02) and Upper Guide rail (#03) onto the threshold and
fasten both sleeves of the Guide rail brackets (#08) to the brackets on the walls.
Tighten the set screws on the Guide rail brackets (#08) to secure the Upper guide rail (#03).
Position the bracket set screws so that they are accessible from the top and bottom.
(Fig 14.1 & 14.2)
Assemble the Wall bracket (#19) at the bottom corner of the Stationary glass (#02). Use the clear
vinyl gasket between the glass and the metal parts to avoid contact with the glass, then tighten the
bolt with the supplied allen wrench.
ENIGMA-Z manual Ver 1 Rev 4 10/2016
Guide block (#12).
overhead view of
guide block and
stationary panel glass
90°
on threshold
1
Position the Stationary glass (#02) against the wall. (Please
Use Caution
1
2
2
Fig. 14
See Fig. 13 for details
Fig. 13
See Fig. 14 for details
3
outside
Painter's Tape
14