3onedata IES215-P Podręcznik użytkownika - Strona 3

Przeglądaj online lub pobierz pdf Podręcznik użytkownika dla Router sieciowy 3onedata IES215-P. 3onedata IES215-P 4 stron. Ies215 series industrial ethernet switch

3onedata IES215-P Podręcznik użytkownika
LED system statue
LED
Statue
Description
ON
PWR connect and running normal
PWR
Power supply have no connection
OFF
or unwonted
ON
Port made effective connection
Link/ACT
Blinking
Port is in active statue
(1~5)
Port did not make effective
OFF
connection
【Installation】
Before installation, confirm that the work environment meet
the installation require, including the power needs and
abundant space. Whether it is close to the connection
equipment and other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat
fountainhead or the area where in intense EMI.
2. Examine
the
cables
and
plugs
requirements.
3. Examine whether the cables be seemly or not (less than
100m) according to reasonable scheme.
4. Power:
DC series product support 9~48VDC power supply;
AC series product support 100~240VAC power supply;
5. Environment: working temperature: -40~75℃
Storage Temperature: -40~85℃
Relative humidity 5%~95%
DIN Rail Installation
In order to use in industrial environments expediently, the
product adopt 35mm DIN-Rail installation, the installation
steps as below:
1.
Examine the DIN-Rail attachment
2.
Examine DIN Rail whether be firm and the position is
suitability or not.
3.
Insert the top of the DIN-Rail into the slot just below the
stiff metal spring.
4.
The DIN-Rail attachment unit will snap into place as
shown below.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before
cable laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable
that
installation
laying;
3. The required cable specification, quantity, direction and
laying position need to match construction requirements,
and cable length depends on actual position;
4. All the cable cannot have break-down and terminal in the
middle;
5. Cables should be straight in the hallways and turning;
6. Cable should be straight in the groove, and cannot
beyond the groove in case of holding back the inlet and
outlet holes. Cables should be banded and fixed when
they are out of the groove;
7. User cable should be separated from the power lines.
Cables, power lines and grounding lines cannot be
overlapped and mixed when they are in the same groove
road. When cable is too long, it cannot hold down other
cable, but structure in the middle of alignment rack;
8. Pigtail cannot be tied and swerved as less as possible.
Swerving radius cannot be too small (small swerving
causes terrible loss of link). Its banding should be
moderate, not too tight, and should be separated from
other cables;
- 3 -
9. It should have corresponding simple signal at both sides
of the cable for maintaining.
【Specification】
Technology
Standard: Support IEEE802.3, IEEE802.3u, IEEE802.3x
Flow control: IEEE802.3x flow control, back press flow
control
Exchange attribute
100M forward speed: 148810pps
Transmit mode: store and forward
System exchange bandwidth: 1.6G
MAC address table: 2K
Interface
RJ45 port: 10Base-T/100Base-TX auto speed control,
Half/full duplex and MDI/MDI-X auto detect
Fiber port: 100Base-FX, SC/FC/ST optional
Transfer distance
Twisted cable: 100M (standard CAT5/CAT5e cable)
Multi-mode: 1310nm, 2Km
Single-mode: 1310nm, 20/40/60Km;
1550nm, 80/100/120Km
Power supply
 DC series switch
Input voltage: 9~48VDC
Support opposite connection protection
Type of input: 3 bit 7.62mm pitch terminal block
 AC Series switch
Input voltage: 100~240VAC
Type of input: 3 bit 7.62mm pitch terminal block
Consumption
 IES215-P (9~48VDC):
Unload consumption: 0.96W@48VDC
Full load consumption: 2.45W@48VDC
 IES215-P (100~240VAC):
Unload consumption: 0.8W@220VAC
Full load consumption: 2.4W@220VAC
 IES215-1F-P (9~48VDC):