Kohler ARICA K-705233 Instrukcja instalacji - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Armatura łazienkowa Kohler ARICA K-705233. Kohler ARICA K-705233 12 stron. Neo-angle shower enclosures

Kohler ARICA K-705233 Instrukcja instalacji
O. FRAME COVER/DOOR SEAL
INSTALLATION
Pivot Side: Install the frame cover/door seal into the
expander jamb channel with the leg of the cover towards
the outside (dry side) of the shower.
Strike Side: Install the frame cover/door seal into the
expander jamb channel with the leg of the cover towards
the inside (wet side) of the shower.
NOTE: Make any final adjustments by adjusting the
center adjustment screws (loosen/tighten) so the
door panel will close firmly against the frame
covers/door seals. Refer to page 6, step I., for
adjustment procedure. Frame covers will need to
be removed to gain access to the adjustment
screws.
P. ATTACH DECORATIVE PIVOT COVERS
Place one of the O-rings into the groove located on the
capscrew of the top pivot assembly.
Place another O-ring in the pivot insert groove on the
opposite side of the glass panel.
Dampen O-ring slightly and push a decorative pivot cover
into place on both sides.
Repeat procedure for bottom pivot assembly.
Kohler Co., Kohler, WI U.S.A.
Frame Cover/
Door Seal
Pivot Assembly
Decorative
Pivot Cover
O-Ring
9
Groove
Decorative
Pivot Cover
BC
116896-2-