Aqua Flo AQUV-8 Instrukcja obsługi - Strona 8

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Systemy filtracji wody Aqua Flo AQUV-8. Aqua Flo AQUV-8 16 stron. Ultraviolet disinfection system

Installing the pre-filter
A 5 micron or finer filter must be installed before the UV system. A pre-filter is not included with this system.
Installing the UV unit
1. Screw a mounting clamp to the wall (wall stud) with
base screws as shown in Fig 3 & Fig 3 side view. Use
appropriate wall anchors if not installing on wall stud.
2. Using a level, vertically align the other mounting clamp at
a distance of about 11-12 inches below the first clamp
Mount using base screws (clamp screws should be in
opposite directions).
3. Mount the UV disinfection chamber on the two bases
and holding it with one hand, tighten the mounting
clamps using a screwdriver or appropriate socket wrench.
4. Mount the ballast on the wall slightly above the chamber
with ballast mounting screws (see Fig 3).
5. Install new plumbing using Fig 3 as reference of how the
final installation should look. The inlet/outlet connections
on the UV are MNPT.
6. If you intend to drain the UV during winter to prevent
freezing, install a copper tee at the inlet of the UV
and plumb in a ball valve and a piece of copper pipe
(See Fig 3)
7. Carefully unpack UV lamp and quartz dome. Note: Hold
lamp and dome by the ends with soft, dry gloves or
cloth. Two (2) o-rings come with the dome. The gland
nut O-ring (thinner) fits in the groove of the gland nut.
8. Gently slide the dome O-ring (thicker) over the top (open
end) of the quartz dome to about 1" from the open end,
Fig 4.
9. Gently insert the quartz dome into the gland nut and
gently rotate the dome while pushing in until it
goes past the nut O-ring and touches the inside top end
of the gland nut. See Fig 4 and 5.
8
Ballast
WATER FLOW
Sediment
Pre-Filter
Drain Port
(Recommended)
Dome O-Ring
Gland Nut
1"
Quartz Dome
TIP: Rotate dome while pushing in
Do not look directly at UV lamp when lanp is on. UV light
can cause serious burns to eyes and skin.
Fig.3
Leave min 36"
clearance on top
Water Sampling
Port
BYPASS VALVE
W
A
L
L
SIDE VIEW
Quartz Dome
Fig.4
WARNING
12"