Deye SUN-6K-SG01LP1-US Podręcznik użytkownika - Strona 16
Przeglądaj online lub pobierz pdf Podręcznik użytkownika dla Falownik Deye SUN-6K-SG01LP1-US. Deye SUN-6K-SG01LP1-US 20 stron. Hybrid inverter
Battery Setting
Float V
55.2V
Shutdown
41.0V
Low Batt
45.0V
Batt
Absorption V
57.6V
Set3
Restart
52.0V
Equalization V
58.8V
TEMPCO(mV/C/Cell)
-5
Equalization Days
90 days
Batt Resistance
Equalization Hours
2.0 hours
25mOhms
5.7 System Work Mode Setup Menu
System Work Mode
Work Mode
Selling First
Work
Mode1
Zero Export To Load
Solar Sell
Zero Export To CT
Solar Sell
Max Sell Power
4000
Energy pattern
BattFirst
LoadFirst
Time Of Use
Time
Batt
Work
~
5:00
80%
Mode2
~
9:00
80%
~
13:00
80%
~
17:00
80%
~
17:00
21:00
80%
~
21:00
01:00
80%
This is Battery 4 tages charge voltage.
This is for professional installers,you can hold default
if you do not know.
Shutdown 10%--the inverter will shutdown if the SOC is
below this.
Low Batt 20% --the inverter will alarm if the SOC is
below this.
Restart 40%
--Restart level when inverter shutdown.
Work Mode
Selling First
:It means that the excess energy has
priority in grid connection.
Zero Export To Load:It means output power according
to it consumed by the load.
Zero Export To CT :It means output power according
to the CT position.
Solar Sell
:It means that the excess solar energy
can be integrated into the grid.
Max Sell Power 0-8000W
Energy Pattern
BattFirst--- It means solar power will charge battery first,
when battery is full then feed-out power to the
Load or Grid.
LoadFirst-- The solar energy will be used to supply the
local load first,then to charge the battery.The
redundant power will export to the public grid.
Time of use
Switch for Grid charging the battery.
Switch for Gen charging the battery.
There are six time period can be set,
each period must from small to large.
- 27 -
5.8 Grid Setup Menu
Grid Setting
Grid Mode
General Standard
UL1741
IEEE1547
Grid
CPUC RULE21
Set1
SRD-UL-1741
Grid Type
220V Single Phase
120/240V Split Phase
120/208V 3 Phase
120V Single Phase
Grid Setting
Grid Frequency
50HZ
60HZ
Grid
Set2
Reconnection Time
60S
PF
1.000
Grid HZ High
Grid Vol High
60.5Hz
265.0V
Grid HZ Low
Grid Vol Low
59.3Hz
185.0V
Grid Setting
Q(V)
FW
VW
Grid
V1:0.0V
Q1:0.00
Fstart:0.00Hz
Vstart:0.0V
Set3
V2:0.0V
Q2:0.00
Fstop:0.00Hz
Vstop:0.0V
Normal Ramp rate
V3:0.0V
Q3:0.00
0.0%/s
V4:0.0V
Q4:0.00
Soft Start Ramp rate
0.0%/s
Grid Setting
L/HVRT
L/HFRT
Grid
HV2:0.0V
0.16S
Set4
HV1:0.0V
0.16S
HF2:0.00HZ
0.16S
LV1:0.0V
0.16S
HF1:0.00HZ
0.16S
LV2:0.0V
0.16S
LF1:0.00HZ
0.16S
LV3:0.0V
0.16S
LF2:0.00HZ
0.16S
Please select the correct Grid Mode in your local area. If
you are not sure, please choose General Standard.
Please select the correct Grid Type in your local area,
otherwise the machine will not work or be damaged.
UL1741&IEEE1547,CPUC RULE21,SRD-UL-1741
No need to set the function of this interface.
General Standard
Please select the correct Grid Frequency in your local area.
You can hole this in default value。
For California only.
For California only.
- 28 -