Alpha Outback Energy GSLC175PV1-230 Skrócona instrukcja obsługi - Strona 4

Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Falownik Alpha Outback Energy GSLC175PV1-230. Alpha Outback Energy GSLC175PV1-230 4 stron.

Wiring
AC Distribution Panel
L1
Neutral
Utility Grid
N
Inverter
Circuit
AC Source
Ground
AC LEGEND
Ground Electrode
Neutral
N
Conductor
(Ground Rod)
HOT L1
L1
Ground
+ -
RELAY
Switch
Battery
12V
Remote
AUX
INV
AUX
Temp
On/Off Switch or EPO
EPO
Remove On/Off
Jumper
Generator
Start
CAT5 Cable
AC Generator
L1
N
L1
AC Subpanel
HOT
NEUTRAL
N
Loads
GROUND
900-0159-01-00 REV C.vsd\Page 4\2015-09-30
FLEXnet DC
Twisted-pair wiring
3
Relay Connections
4
GS7048E wiring and
external system
+
-
RELAY
Switch
12V
Remote
Battery
AUX
AUX
INV
Temp
with GSLC175-PV-230
L
N
L
N
L
N
OUT
GEN
GRID
2
RTS
Cable
5
7
6
8
GS3548E wiring
Battery
1
(+) Positive
With GSLC175PV1-230 and grid bypass
Sense
2
(–) Negative
To ports as shown below
(not shown)
5
(–) Bus Bar
Shunt C
6
(–) FM-80 #2
7
(–) Bus Bar
Shunt B
8
(–) FM-80 #1
L
N
L
N
L
N
OUT
GEN
GRID
9
(–) Bus Bar
Shunt A
(–) Inverter
10
and grid bypass
To AC, DC, and PV as below
FM80 #1
10
9
1
N
GS7048E multiple inverters (stacking)
To ports as shown below
with GSLC175-PV-230; PV and FLEXnet DC not shown
L
N
L
N
L
N
OUT
GEN
GRID
N
N
AC Output Bus
AC Input Bus
(Loads)
(Generator)
When stacking in parallel configuration:
AC input and output conductors can share common connections from external AC input and output
buses. These are shown above.
FM80 #2
When stacking in three-phase configuration (third inverter is not shown):
Isolate AC conductors to separate input and output buses for phases A, B, and C.
In any configuration:
Do not use the OutBack bypass assembly in the GSLC.
Connect all DC, PV, AC neutral (common), and ground wires as shown in the main GS7048E diagram.
Connect all CAT5 cables using the appropriate ports in the communications manager.
PV Array #2
PV Array #1
I
I
I
I
I
I
I
I
I
I
I
I
O
O
O
O
O
O
O
O
O
O
O
O
PV
LEGEND
Negative
Positive
Ground
RADIAN Series
L
N
L
N
L
N
OUT
GEN
GRID
N
To
batteries
AC Input Bus
(Utility Grid)
PV Array #1
PV Array #2
Battery Bank
BATTERY
LEGEND
Negative
Positive
Vented Battery Enclosure
Ground
RTS